Learning Pentaho Data Integration 8 CE(Third Edition)
上QQ阅读APP看书,第一时间看更新

The Job metrics tab

The Job metrics tab shows, for each entry of the Job, several status, and information columns. For us, the most relevant columns in this tab are:

Note that the content of both the Logging and Job metrics tabs are color-coded:

  • When there is an error, you see the lines in red
  • When an entry succeeds, you can see the details in green
  • If the log or metric is only informative, it is shown in a black font

Besides, the result of the execution of inpidual entries is represented with small ticks on top of the icons, as shown in the following screenshot:

Result of  the execution of a Job